C2.01 National integrated water resources management plans
Water framework directive 2000/60/EC (EU WISE, 2000)
Status Report on IWRM and Water Efficiency Plans (UN-Water, 2008)
Evaluation of partnership for Africa’s water development program (GWP, 2008)
Planning Process: Guidance Document # 11 (EC, 2000)
Unlocking door to social development and economic growth (GWP, 2004)
Catalyzing Change: A handbook for developing IWRM and water efficiency strategies (GWP, 2004)
IWRM and water efficiency plans by 2005 (GWP, 2004)
IWRM Plans Training Manual (Cap-Net/GWP/UNDP, 2005)
IWRM: Putting a Good Theory into Practice: Experience of Central Asia (ICWC, 2009)
Planning for a water secure future; lessons from Africa (GWP, 2008)
IWRM guidelines at river basin level (UNESCO, 2009)
IWRM in Action (UNESCO/UNWWAP/UNEP-DHI, 2009)
Lessons from IWRM in Practice (GWP, 2009)
Improving Africa Water Security (GWP, 2009)
Better water resources management – Greater resilience today, more effective adaptation tomorrow (GWP, 2009)
Development Lessons from Water Management (GWP, 2010)
Water security for development: Insights from African partnerships in action (GWP, 2010)
USA: Application of watershed models for integrated water quality and coastal resources restoration in Chesapeak Bay ( #123)
Bangladesh: Drainage management in Sagarkhali and Borobeela Basins (#276)
Zambia: Integrated Water Resources Management and Water Efficiency (IWRM/WE) planning process (#332)
Burkina Faso: Action Plan for IWRM (#338)
Senegal: IWRM Planning Process in Senegal (#334)
Mali: Capitalizing on the process of elaboration of the Action Plan for IWRM (#345)
Kazakhstan: Institutional reform in water sector to implement IWRM plan (#342)
Eritrea: Vital aspects of the Eritrean IWRM planning process (#366)
Kenya: Roles and Responsibilities in IWRM Planning Process (#373)
Malawi: Ensuring sustainability in IWRM processes (#374)
Cameroon: Planning for sustainable water resources development and management (#375)
Benin: Getting started: the experiences of IWRM planning process (#381)
Characteristics
Policies and decisions regarding water resources management flow are determined at the national level. National governments and water agencies influence international cooperation on transboundary water bodies and develop the national framework of policies, legislation and institutions within which water resources management at basin and sub-basin level takes place (See A1). Depending on basin boundaries and scales, nations are often part of international basins, such as seen in the Nile River Basin and Mekong River Basin. At the same time these nations have basins, which are fully within national borders and thus sub-ordinate to the national level. The boundaries of groundwater aquifers seldom coincide with those of the river basins. The management of such aquifers often requires collaboration across national river basin boundaries and in some cases international cooperation is required.
A National IWRM plan will be set within this geographical and political context, and will take into account all activities and developments requiring water or influencing the water resource. Among these are, ecological requirements, water supply and sanitation, irrigation, land use and forestry, fisheries, hydropower and industrial use.
A good IWRM Plan includes a prioritised series of programmes for implementing the framework. The sequel to an IWRM plan is a development plan. Implementation of the management plan is a prerequisite for implementation of the development plan and ensures that the development takes place in a balanced fashion with due consideration of the national policies and strategies – operational aspects are explicitly addressed.
The formulation of a National IWRM Plan follows a distinct four phase approach:
- Identify the range of water resources issues that occur across the country and assessment of their severity, mutual dependence and frequency of occurrence. A ”user requirement issue” results from an inadequate matching of user requirements (demand) and water resources availability and quality (supply) while an ”impact issue” derives from human activities that negatively affect the quantity or quality of the water resource or from natural causes in the case of floods and droughts. International issues should also be taken into account, for instance upstream-downstream issues.
- Identify the management interventions at all levels – national, basin, local - necessary to address the issues identified. From the interventions required identify the management functions at each level. Management functions include such items as policy development, planning and coordination, water allocation, discharge regulation, monitoring, enforcement and information dissemination. Transboundary problems may require concerted international interventions.
- Analyse the present institutional capacities at all levels – national, basin, local - potentials and constraints in the perspective of the issues to be dealt with and functions to be undertaken. The capacities relate to factors such as efficiency of institutional structures and adequacy of human and financial resources and of policies and legislation. International structures and agreements may be required to supplement the national institutions. (See B1 and B2).
- Prepare strategies for development of deficient parts of the framework of national policies, legislation and regulations for IWRM, for development of institutional roles that allow a coordinated implementation of IWRM and for development of the required management instruments and associated skills. International strategies have to be developed in collaboration with other riparian nations.
Lessons learned
- A realistic IWRM Plan requires the design of functions, structures and procedures to take into account the financial and human resource constraints, the existing institutional structures, the management capacity and the capacity for change
- Structures should be designed as need arises and should be flexible enough to meet immediate needs and leave the possibility for expansion open whenever appropriate
- Multi-stakeholder involvement in the decision processes are essential for the acceptability of the outcome
- Ecosystem requirements and water quality management are often largely neglected but need to be given full emphasis in the planning process
- Decentralised water resources management is often part of water reforms but implementation is often constrained by central agencies´ reluctance to share power and resources.

